GOSHEN MECHANICAL CONTRACTORS INC.
  • Home
  • Our History
  • Our Staff
  • Services
  • Construction
  • Projects
    • Philadelphia Museum of Art Main Chiller Replacement
    • Philadelphia Museum of Art ATC Major Control Valve Upgrade
    • Laura Carnell Elementary School
    • Samuel Gompers Elementary School SDP ESCO Phase 1
    • Natural Gas Underground Installation for Commercial Application
    • Pocopson Home Energy Savings Kitchen Project and Facility Wide Electrical Panel/Switchgear Upgrades
    • Lowell Elementary Crane Lift
  • Safety
  • Affiliations
  • Contact Us

Lowell Elementary Crane Lift

Here Goshen set the 25,000 lb chiller on the roof at Lowell Elementary School as well as dropped in our 8" 60-foot-long chilled water S&R risers from the roof to the basement level. Our excitement was even higher when using the lift Liebherr's prototype. It's the first of its kind and only one in the U.S. 360 Ton crane with 295 feet of boom which the longest in the U.S, we had out 210 ft. at our max!
Contact

​640 Snyder Avenue
Unit A
West Chester
PA
19382

(610) 644-4460
Company

Our History 
Our Staff
Safety Awards
Affiliations
​Contact Us
Services

​Our Services 
Construction

Construction Page

​
Projects

Featured Projects
Location:

Copyright © 2022 Goshen Mechanical Contractors, Inc. All Rights Reserved.

  • Home
  • Our History
  • Our Staff
  • Services
  • Construction
  • Projects
    • Philadelphia Museum of Art Main Chiller Replacement
    • Philadelphia Museum of Art ATC Major Control Valve Upgrade
    • Laura Carnell Elementary School
    • Samuel Gompers Elementary School SDP ESCO Phase 1
    • Natural Gas Underground Installation for Commercial Application
    • Pocopson Home Energy Savings Kitchen Project and Facility Wide Electrical Panel/Switchgear Upgrades
    • Lowell Elementary Crane Lift
  • Safety
  • Affiliations
  • Contact Us